38 clashes caught before work began — the difference BIM design makes in Bishkek

At the first warehouse, the ventilation ran straight through the beams, and the outlets ended up behind the racking. For the second project, using a model, 38 clashes were caught before work even started, and the site foreman stopped calling to ask "how do I handle this one

BIM-проектирование: почему объём считают до стройки

How it usually goes

Azamat was building a warehouse from drawings he'd received on paper. Every week the same problems turned up on site: ventilation ran right where a beam was, outlets ended up behind racking, and the concrete volumes were off from the estimate by a quarter

For the second project, he asked for a model. The clashes were found before construction — thirty-eight of them, all right there on screen. Material volumes were calculated straight from that same model

Azamat says the main change wasn't in the drawings. It's that his foreman stopped calling him to ask "how do I handle this?"

Who reaches out

People reach out after their first build, where the estimate didn't match reality. Others come to us because they need to show the project to an investor or a bank before work begins

If this sounds like you

  • Turnkey project total m² and price
  • Can I order just the design?
  • How long does the design phase take?

How it works

The building is assembled in full as a 3D model: walls, floor slabs, the frame, and all the engineering systems are placed exactly where they belong. The model reveals clashes between utilities and structural joints before any concrete gets poured

Material volumes come from the model, not from a rough estimate. That's why the budget stays closer to reality, and why resizing something in one place automatically updates the rest of the drawings

How to prepare

You'll need the site, the building's purpose, and the desired floor area. If you have any layout preferences, a rough hand-drawn sketch is enough for the first conversation

Frequently asked questions

How much does design cost per square meter?

For commercial buildings, expect around $12–15 per m². Across all project types the range is $7–20 per m²: the exact figure depends on floor area, number of stories, and scope of work

Is a model needed for a small project?

On a small project the benefit is smaller. It's worth it once you're at a floor area where the engineering is already complex: manufacturing, healthcare, food service

Source for this case study — JBN's correspondence with clients and the company's publications. The story is composed from a pattern of similar inquiries: the name is invented, details have been changed

This is a real case, compiled from JBN's publications. The client's name has been changed

Submit a requestChoose a time on the booking page

More case studies

кадр из публикации JBN: Пересчёт занял неделю — сколько стоит сейсмический расчёт в БишкекеRecalculation took a week — how much does a seismic analysis cost in BishkekThe shopping center project was finished quickly, but a gap turned up during approval: there was no seismic calculation. It had been treated as a formality, which delayed the recalculation by a weekкадр из публикации JBN: Построили БЦ 6500 м² — сколько стоит проект и стройка в БишкекеBuilt a 6500 m² business center — how much do design and construction cost in BishkekThe Client had a plot for an office center but was stuck on questions: how many floors would be allowed, where the parking would go, whether there'd be enough electricity. We helped sort out the constraints, designed a 6500 m² business center for him, and built it with one team, without the usual disputes between designer and builderкадр из публикации JBN: 1000 м² клиники избежали сноса стен — где заказать проект в БишкекеA 1000 m² clinic avoided demolishing walls — where to order a design project in BishkekSome walls in JBN's first clinic were torn down because of approval requirements: the rooms looked like simple partitions. The second, 1000 m² center avoided that fate, its layout was worked out together with the design from the startкадр из публикации JBN: 1200 м² раскладки просчитали за 6 дней — сколько стоит точный фасад в Бишкеке1200 m² of paneling calculated in 6 days — how much does a precise façade cost in BishkekThe façade joints now run strictly along the floor lines, and the corners come together without a single offcut, though there had been fears it would turn out otherwise. The entire layout for 1200 m² was calculated before ordering materials, in 6 days, to avoid disputes on siteкадр из публикации JBN: Не увидел разницы в цене за м² — как формируется стоимость стройки в БишкекеDidn't see the difference in price per m² — how construction costs are formed in BishkekA person planning a seven-story hotel got lost in the price per square meter, not seeing the difference between a 'shell' and a finished building. Now he understands exactly what the contractor does while he focuses on growing his businessкадр из публикации JBN: Дом 166 м² завис из-за бумаг — сколько стоит ввод в эксплуатацию в БишкекеA 166 m² house stalled over paperwork — how much does building commissioning cost in BishkekA 166 m² house stalled at the commissioning stage because the list of required documents was unclear. Just one conversation helped clarify the situation and put together a clear plan for getting the missing paperwork

Разборы данных: расписания, цены и услуги рынка

КыргызстанБишкек · design and construction