The recalculation took a week — how much does a seismic calculation cost in Bishkek

The shopping center project was finished quickly, but during approval a gap turned up: there was no seismic calculation. It had been treated as a formality, which delayed the recalculation by a week

Сейсмический расчёт здания: как считают и зачем

How it usually goes

Daniyar is building a shopping center on a ten-sotka plot. The project was done for him quickly and cheaply, the budget worked out, and the contractor was ready to start in spring

The question of seismic design came up during approval. Daniyar thought it was just a formality and a signature from the structural engineer. It turned out there was no calculation at all: the project had sections drawn 'the way it's usually done,' with no numbers behind them

The recalculation took a week. The column sections grew, the reinforcement changed, and the budget went up. Daniyar says it would have been cheaper to calculate it from the start — but at the time he didn't know it was a separate piece of work

What people come to us with

People come with a finished project and ask to 'just get it approved.' In half the cases there's no seismic calculation in it at all — just solutions copied from a neighboring building. The second common case: construction is already underway, and one of the inspectors asked about the calculation

If this sounds like you

  • How much a construction license will cost
  • I have a 10-sotka plot, I need a multifunctional shopping center up to 5 floors
  • We applied for an extension, they haven't granted it yet

How it works

The calculation is done in LIRA SAPR software, with part of the work done by hand — when the case is non-standard or the machine result needs checking. They look at where the loads occur, whether the element sections are sufficient, and how the building will behave during a tremor

The result isn't a one-page conclusion. The sections, reinforcement, and sometimes the frame layout itself change, so the calculation becomes part of the project and goes along with it

How to prepare

Bring what you already have: a sketch or finished project, plot data, number of floors, and the building's purpose. If someone else did the project, bring it in full — it can't be checked sheet by sheet

Frequently asked questions

Can seismic calculations be done for someone else's project?

Yes. The whole project is reviewed: the calculation may require changing the sections and reinforcement, in which case some sheets will need to be redone

Is this a separate service or part of the project?

It's part of the design process. It's done separately when the project is already finished and needs to be checked

Source of this case study — JBN's correspondence with clients and the company's publications. The story is compiled from similar inquiries: the name is fictional, details have been changed

This is a real case, compiled from 'JBN' publications. The client's name has been changed

Submit a requestChoose a time on the booking page

More case studies

кадр из публикации JBN: 38 коллизий выявили до работ — в чём разница BIM-проектирования в Бишкеке38 clashes caught before construction — what makes BIM design different in BishkekAt the first warehouse, ventilation ran straight through the beams, and outlets ended up behind the shelving. For the second site, with a model in place, 38 clashes were caught before work even started, and the site manager stopped calling to ask "how do we handle this oneкадр из публикации JBN: Построили БЦ 6500 м² — сколько стоит проект и стройка в БишкекеBuilt a 6,500 m² business center — what the design and construction cost in BishkekThe Client had a plot for an office center but kept getting stuck on the questions: how many floors would be allowed, where the parking would go, whether there'd be enough power. We helped sort out the constraints, designed a 6,500 m² business center for him, and built it with one team, with no disputes between designer and builder like beforeкадр из публикации JBN: 1000 м² клиники избежали сноса стен — где заказать проект в Бишкеке1,000 m² clinic avoided having its walls torn down — where to order a design in BishkekAt the first JBN clinic, some walls were torn down because of approval requirements — the rooms looked like mere partitions. The second, 1,000 m² center avoided that fate, since its layout was worked out together with the design from the startкадр из публикации JBN: 1200 м² раскладки просчитали за 6 дней — сколько стоит точный фасад в БишкекеLayout for 1,200 m² calculated in 6 days — what an accurate façade costs in BishkekThe façade joints now run precisely along the floor lines, and the corners come together without a single offcut, even though we worried it might turn out otherwise. The entire layout for 1,200 m² was calculated before ordering materials, in just 6 days, to head off disputes on siteкадр из публикации JBN: Не увидел разницы в цене за м² — как формируется стоимость стройки в БишкекеDidn't see the difference in price per m² — how construction costs are formed in BishkekA person planning a seven-story hotel got lost in the price per square meter, unable to see the difference between a "shell" and a finished building. Now he knows exactly what the contractor delivers, while he focuses on growing his businessкадр из публикации JBN: Дом 166 м² завис из-за бумаг — сколько стоит ввод в эксплуатацию в Бишкеке166 m² house stalled over paperwork — what occupancy permits cost in BishkekA 166 m² house stalled at the occupancy permit stage because the list of required documents stayed unclear. Just one conversation helped clarify the situation and put together a clear plan for getting the missing papers

Разборы данных: расписания, цены и услуги рынка

КыргызстанБишкек · design and construction