JBN
Bishkek · design and construction

JBN — design and construction in Bishkek

Бишкек, ул. Турусбекова 9 (над кафе «Макаронная») · 5 days a week, 09:00–18:00. Requests go through WhatsApp: send a message and they will reply and pick a time

Request · times are Bishkek local

Send a request

Tell us what you need

We will hold the slot

While you fill in the details the slot stays yours — nobody else can take it

We will remind you

A day before the visit we message you on WhatsApp: address, time and how to prepare

Rescheduling is free

Plans changed — just message the chat and we will find another time

+996 556 220-088@jbn.kg_

Services and prices

items in the price list: 7
  • Проектирование коммерческих объектов, за м²12 $
  • Архитектура и концепция объекта
  • Рабочая документация
  • Строительство каркаса и объект под ключ
  • Авторский надзор на стройке
  • Сейсмический расчёт конструкций
  • Первичная консультация и оценка проекта

Who sees you

FAQ

JBN: how do I send a request?

Pick a service and a time right on this page — Commercial Project Design, per m², Architecture and object concept, Working Documentation and more. The request goes to WhatsApp and the time is confirmed in chat

Where is JBN located?

Бишкек, ул. Турусбекова 9 (над кафе «Макаронная»)

What are the opening hours?

5 days a week, 09:00–18:00

How much do the services cost?

The current price list comes on WhatsApp — the place keeps its own prices. Place: JBN. City: Bishkek. Service: design and construction

How to get there

Case studies

how it went for others
Recalculation took a week - how much does seismic calculation cost in BishkekRecalculation took a week - how much does seismic calculation cost in BishkekThe shopping center project was completed quickly, but during approval, a gap was discovered: seismic calculation was missing. It was treated as a formality, which delayed the recalculation by a week38 conflicts identified before work - what's the difference of BIM design in Bishkek38 conflicts identified before work - what's the difference of BIM design in BishkekAt the first warehouse, ventilation ran through the beams and outlets ended up behind the shelves. For the second facility with the model, 38 conflicts were identified before work started, and the contractor stopped calling asking 'how does this go'Built BC 6500 m² - how much does a project and construction cost in BishkekBuilt BC 6500 m² - how much does a project and construction cost in BishkekThe client had a site for an office center but was lost in questions: how many floors will be allowed, where is the parking, is there enough electricity. We helped him understand the constraints, designed a business center for him on 6500 m² and built it with one team, without past disputes between designer and contractor1000 m² clinic avoided wall demolition - where to order a project in Bishkek1000 m² clinic avoided wall demolition - where to order a project in BishkekPart of the walls in the first JBN clinic were demolished due to approval requirements: the offices looked like simple partitions. The second center of 1000 m² avoided such fate, its layout was designed from the start1200 m² facade layout was calculated in 6 days - how much does accurate facade cost in Bishkek1200 m² facade layout was calculated in 6 days - how much does accurate facade cost in BishkekFacade seams now run strictly along the floors, and corners are assembled without a single scrap, although previously they were afraid it would be different. All 1200 m² layout was calculated before ordering materials in 6 days to avoid disputes on siteDidn't see the difference in price per m² - how construction cost is formed in BishkekDidn't see the difference in price per m² - how construction cost is formed in BishkekThe person planning a seven-story hotel got lost in the square price: didn't see the difference between 'shell' and finished facility. Now it's clear to him what exactly the contractor does while he develops his businessHouse 166 m² hung up due to papers - how much does commissioning cost in BishkekHouse 166 m² hung up due to papers - how much does commissioning cost in BishkekHouse 166 m² hung up at the commissioning stage because the list of required documents remained unclear. Just one conversation helped clarify the situation and draw up a clear plan for obtaining missing documentsSix months spent on reconciliation - what's the difference between one and two contractors in BishkekSix months spent on reconciliation - what's the difference between one and two contractors in BishkekSix months spent on reconciliation between designer and contractor: the project was split to save money, but had to pay extra to both. For the second facility, everything was entrusted to one contractor, saving time and nervesDispute resolved with one view - how much does 3D visualization cost in BishkekDispute resolved with one view - how much does 3D visualization cost in BishkekA couple building a guest house argued for a long time about its appearance: one wanted wood, the other glass, and couldn't find a compromise. 3D visualization on their site quickly showed that one option faced the neighbor's fence, and a months-long dispute was resolved with one view
slot is held · 15:00 nobody else can take this slot
Request via WhatsAppBishkek · design and construction