JBN
Bishkek · design and construction
The dispute was settled in a single viewing — how much a 3D visualization costs in BishkekJBN

The dispute was settled in a single viewing — how much a 3D visualization costs in Bishkek

· 5 min read

A couple building a guest house had long argued about how it should look: one wanted wood, the other glass, and they couldn't find a compromise. A 3D visualization on their actual plot quickly showed that one of the options faced straight into the neighbor's fence, and the months-long argument was settled in a single viewing

The dispute was settled in a single viewing — how much a 3D visualization costs in Bishkek

How it usually goes

Jamilya and her husband were building a guest house on eight sotkas near Issyk-Kul. They'd already bought a 100 kVA transformer, and the plot had been cleared

Their argument was about the look. He pictured wood and a pitched roof, she pictured glass and a flat one. Each of them kept showing photos from the internet, and the conversation went in circles

The argument ended with the render. Both options were placed on their actual plot, with their terrain and the lake view, and it became clear that the glass version looked straight into the neighbor's fence

What people come with

People come in with two different visions within the family, or with a picture of someone else's house. Less often, they come with a finished project and ask to see how it will look in real life

If this sounds like you

  • We have a plot of land in the village of Bosteri, 8 sotkas
  • A 100 kVA transformer has already been purchased
  • Render of a residential complex

How it works

The building is placed on your actual plot, with the real terrain and orientation to the compass points. The facade, volumes, and materials are reviewed in daylight

A change on the image costs a workday. A change on site costs a week and materials — so it's better to argue before the foundation

How to prepare

Send us the documents for the plot and photos taken on site, including the view from the neighbors. A render without the terrain and surroundings shows a picture, not your house

Most common questions

Is the render included in the project?

Visualization is done at the concept stage. Its scope is discussed separately: showing the overall look is one thing, showing the interiors of every room is another

Can you make a render from someone else's project?

Yes. We need the drawings and the plot data — without them you'd get a picture that isn't tied to the actual location

Source of the case study — JBN's correspondence with clients and the company's publications. The story is compiled from similar inquiries: the name is fictional, details have been changed

The case is real — compiled from JBN's publications. The client's name has been changed

Submit a requestChoose a time on the booking page

Other case studies

Recalculation took a week — how much does a seismic calculation cost in BishkekRecalculation took a week — how much does a seismic calculation cost in BishkekThe shopping center project was finished quickly, but the approval process revealed a gap: there was no seismic calculation. It had been treated as a formality, which delayed the recalculation by a week38 clashes found before construction started — what makes BIM design in Bishkek different38 clashes found before construction started — what makes BIM design in Bishkek differentAt the first warehouse, the ventilation ran straight through the beams, and outlets ended up behind the shelving. For the second site, using a model, 38 clashes were found before work even began, and the site foreman stopped calling to ask "how do I handle this one"Built a 6,500 m² business center — how much design and construction cost in BishkekBuilt a 6,500 m² business center — how much design and construction cost in BishkekThe Client had a plot for an office center but kept getting stuck on questions: how many floors would be allowed, where the parking would go, whether there'd be enough electricity. We helped him work through the constraints, designed a 6,500 m² business center for him, and built it with one team, with none of the usual disputes between designer and builder1,000 m² clinic avoided wall demolition — where to order a design in Bishkek1,000 m² clinic avoided wall demolition — where to order a design in BishkekPart of the walls in the first JBN clinic were torn down because of approval requirements: the rooms looked like simple partitions. The second, 1,000 m² center avoided that fate, since its layout was worked out together with the design from the start1,200 m² of paneling laid out in 6 days — how much a precise façade costs in Bishkek1,200 m² of paneling laid out in 6 days — how much a precise façade costs in BishkekThe façade joints now run strictly along the floor lines, and the corners come together without a single cut piece, even though there were fears it would turn out otherwise. The entire layout for 1,200 m² was calculated before ordering materials, in 6 days, to avoid disputes on siteDidn't see the difference in price per m² — how construction costs are formed in BishkekDidn't see the difference in price per m² — how construction costs are formed in BishkekA man planning a seven-story hotel got lost in the price per square meter, unable to see the difference between a "shell" and a finished building. Now he clearly understands what the contractor actually does, while he focuses on growing his business

Specialists

Услуги заведения

At a glance

Где принимают. Бишкек, Бишкек, ул. Турусбекова 9 (над кафе «Макаронная»)

Phone. +996556220088

Open slots and booking: JBN

Market data: schedules, prices and services

JBNBishkek · design and construction
Ответ обычно за минуту Usually replies within a minute