How a 1000 m² clinic avoided tearing down walls — where to order a project in Bishkek
· 5 min read
Part of the walls in JBN's first clinic were torn down because of approval requirements: the rooms had looked like simple partitions. The second, 1000 m² center avoided that fate — its layout was built together with the project from the start
How it usually goes
Gulmira and her partner were opening a clinic and found space on the first floor of a residential building. Renovation started before the project: it seemed like the rooms were just partitions and finishing
The requirements surfaced at the approval stage. The procedure room needs separate ventilation, clean and dirty flows can't cross, the corridor needs to be wide enough for a stretcher. Some of the partitions had to be torn down
They started their second project with a design from day one. A thousand-square-meter building, three floors and a basement — the layout was built around the requirements from the outset
What people come to us with
People come with a space where renovation is already underway, asking what needs to be fixed. They also come with a plot of land for a standalone clinic or rehabilitation center building
If this sounds like you
- A rehabilitation-wellness and office facility
- over 2000 sq.m in Bishkek
- Do you work with commercial properties?
How it works
The layout is built starting from medical-space requirements: ventilation, flow of people, evacuation routes, finishing. Only after that is the interior drawn up
That's how the 1000 m² building with a basement and three floors was put together: the set of rooms and the engineering systems were built into the project from the start, not fitted into a finished shell afterward
How to prepare
You need a list of rooms and equipment — even just as a list. It determines the ventilation, electrical wiring, and the size of the spaces
Most common questions
Will a space in a residential building work for a clinic?
Sometimes yes, sometimes no. It depends on the set of rooms, ventilation, and a separate entrance — this is assessed for the specific space
Do you handle the approvals yourselves?
Yes. Documentation and approvals go together with the project, so there's no need to look for a separate contractor for that
Source of this case study — JBN's correspondence with people who reached out, and the company's publications. The story is compiled from similar recurring inquiries: the name is fictional, details have been changed
This is a real case, compiled from JBN's publications. The client's name has been changed
Submit a requestChoose a time on the booking pageOther case studies
The recalculation took a week — how much does a seismic calculation cost in BishkekThe shopping center project was finished quickly, but a gap turned up during approval: there was no seismic calculation. It had been treated as a formality, which dragged the recalculation out by a week
38 clashes caught before work began — what makes BIM design in Bishkek differentOn the first warehouse, ventilation ran straight through the beams and outlets ended up behind the shelving. For the second site, the model caught 38 clashes before work even started, and the site foreman stopped calling to ask “what about here
Built a 6500 m² business center — what a project and construction cost in BishkekThe Client had a plot for an office center but kept getting stuck on questions: how many floors would be allowed, where the parking would go, whether there'd be enough electricity. We helped sort out the constraints, designed a 6500 m² business center for them, and built it with one team, with none of the usual disputes between designer and builder
1200 m² of layout calculated in 6 days — what an accurate façade costs in BishkekThe façade joints now run strictly along the floor lines, and the corners come together without a single offcut, even though there'd been worries it would turn out otherwise. The entire layout for 1200 m² was calculated before ordering materials, in 6 days, to avoid disputes on site
Didn't see the difference in price per m² — how construction costs are formed in BishkekSomeone planning a seven-story hotel got lost in the price per square meter, unable to see the difference between a “shell” and a finished building. Now it's clear to him exactly what the contractor does, while he focuses on growing his business
A 166 m² house stalled over paperwork — what it costs to get occupancy approval in BishkekA 166 m² house got stuck at the occupancy-approval stage because the list of required documents stayed unclear. Just one conversation was enough to clarify the situation and map out a clear plan for getting the missing paperwork