Built a 6,500 m² business center — how much the design and construction cost in Bishkek

The Client had a plot for an office center, but kept getting stuck on questions: how many floors would be allowed, where parking would go, whether there'd be enough power. We helped him work through the constraints, designed a 6,500 m² business center for him, and built it with one team — no disputes between designer and builder

Бизнес-центр 6500 м²: от проекта до сдачи

How it usually goes

Marat had a plot downtown and a sense that an office center should go there. Then came the questions he didn't have answers to: how many floors would be allowed, where parking would go, whether there'd be enough electrical capacity

The first conversation was about these constraints, not the façade. The area came out of them: six and a half thousand square meters

The construction was handled by a single contractor — the same one who did the design. Marat says he chose it that way after a past project where the designer and the builder argued for six months over who was to blame for a crack

What people come with

People come with a plot and a general idea: offices, rental, retail on the ground floor. Less often they come with a finished project from another company and ask to have it completed

If this is about you

  • Can I get a turnkey price per square meter?
  • Hello, how much does design and construction cost per m²
  • The project is a rehabilitation and wellness center plus offices, over 2,000 m²

How it works

First they look at the plot and its constraints: what's allowed by code, how much grid capacity is available, where parking will fit. The concept and area come out of that

Then comes architecture, structural design with calculations, working drawings, and construction. Design oversight on site is handled by the same people who did the design, so decisions on site aren't reinvented from scratch

An example of a delivered project — the Horizon business center at 6,500 m²: from design through to commissioning

How to prepare

You'll need the documents for the plot, the desired purpose for each floor, and a rough timeline. There's no need to state a budget at the first meeting — it's calculated from the area

Most common questions

Do you give a warranty?

A legal warranty is given for all stages of work. The second-tier license allows the company to manage the project through to commissioning

Can I hire you just for construction if I already have a design?

Yes. In that case they first calculate the estimate based on your design and show you where you can stay within budget without losing quality

Source of this case study — JBN's correspondence with people who reached out and the company's publications. The story is compiled from similar inquiries: the name is fictional, details have been changed

This is a real case, compiled from JBN's publications. The client's name has been changed

Leave a requestChoose a time on the booking page

Other case studies

кадр из публикации JBN: Пересчёт занял неделю — сколько стоит сейсмический расчёт в БишкекеRecalculation took a week — how much does a seismic calculation cost in BishkekThe shopping center project was finished quickly, but a gap turned up during approval: there was no seismic calculation. It had been treated as a formality, which delayed the recalculation by a weekкадр из публикации JBN: 38 коллизий выявили до работ — в чём разница BIM-проектирования в Бишкеке38 clashes caught before work began — what makes BIM design in Bishkek differentAt the first warehouse, ventilation ran straight through the beams, and outlets ended up behind the racking. For the second site, working from a model, 38 clashes were caught before work even started, and the site foreman stopped calling to ask “how do I handle this oneкадр из публикации JBN: 1000 м² клиники избежали сноса стен — где заказать проект в Бишкеке1000 m² clinic avoided tearing down walls — where to order a project in BishkekAt the first JBN clinic, some walls had to be torn down because of approval requirements — the rooms had looked like simple partitions. The second, 1000 m² center avoided that fate, since its layout was worked out together with the project from the startкадр из публикации JBN: 1200 м² раскладки просчитали за 6 дней — сколько стоит точный фасад в БишкекеLayout for 1200 m² calculated in 6 days — how much a precise façade costs in BishkekThe façade joints now run strictly along the floor lines, and the corners come together without a single offcut, even though there'd been worry it wouldn't turn out that way. The whole layout for 1200 m² was calculated before ordering materials, in 6 days, to avoid disputes on siteкадр из публикации JBN: Не увидел разницы в цене за м² — как формируется стоимость стройки в БишкекеDidn't see the difference in price per m² — how construction costs are put together in BishkekSomeone planning a seven-story hotel got lost in the price per square meter, unable to see the difference between a “shell” and a finished building. Now it's clear to him exactly what the contractor does, while he keeps growing his businessкадр из публикации JBN: Дом 166 м² завис из-за бумаг — сколько стоит ввод в эксплуатацию в Бишкеке166 m² house stalled over paperwork — how much occupancy permit costs in BishkekA 166 m² house got stuck at the occupancy permit stage because the list of required documents wasn't clear. Just one conversation helped clarify the situation and put together a clear plan for getting the missing papers

Разборы данных: расписания, цены и услуги рынка

КыргызстанБишкек · design and construction