It took half a year to make peace — the difference between one contractor and two in Bishkek
· 5 min read
It took half a year to reconcile the designer with the builder: the project was split up to save money, but both ends up having to be paid extra. On the second building, everything was entrusted to a single contractor, saving time and nerves
How it usually goes
Sanzhar ordered the design from one company and the construction from another, because it came out cheaper that way. The first discrepancies showed up at the foundation
The designer said the building wasn't going up to the drawings. The builder said the drawings couldn't be built as they were. Sanzhar spent half a year going back and forth between them and ended up paying extra to both
For the second building, he handed everything to a single contractor. There was no one left to argue with — and that turned out to be the biggest saving
What people come to us about
People ask if they can order just the design. They can, but the design is done with an eye toward who will build it and how
If this sounds like you
- Do you only do design, or construction too?
- Can I order just the design?
- Do you already have a design? We could work out an estimate
How it works
The sequence is: concept, architecture, structural design with calculations, working documentation, construction, and site supervision
The stages run under a single contract. There's no handoff point between them where decisions usually get lost and the question of "who was supposed to do this" comes up
How to prepare
A plot of land, the building's purpose, and the desired area are enough. Everything else gets worked out at the first consultation
Most frequently asked questions
How much does design cost?
For commercial buildings, the benchmark is $12 to $15 per m². Across projects overall, the range is $7 to $20 per m²
Is the initial consultation paid?
No. The first consultation and preliminary project assessment are free — you can meet at the office or go through the task online
Source of this case study — JBN's correspondence with people who reached out, and the company's publications. The story is compiled from similar inquiries: the name is fictional, details have been changed
The case is real — compiled from JBN's publications. The client's name has been changed
Submit a requestChoose a time on the booking pageOther case studies
Recalculation took a week — how much does a seismic calculation cost in BishkekThe shopping center project was finished quickly, but a gap turned up during approval: the seismic calculation was missing. It had been treated as a formality, which delayed the recalculation by a week
38 clashes found before construction started — what makes BIM design in Bishkek differentAt the first warehouse, ventilation ducts ran straight through the beams, and outlets ended up hidden behind shelving. For the second site, using a model, 38 clashes were caught before work began, and the site foreman stopped calling to ask, "so how do we handle this one—"
Built a 6,500 m² business center — how much do design and construction cost in BishkekThe Client had a plot for an office center, but he was stuck on questions: how many floors would be allowed, where to fit parking, whether there'd be enough power. We helped him work through the constraints, designed a 6,500 m² business center for him, and built it with one team, with none of the usual disputes between designer and builder
1,000 m² clinic avoided tearing down walls — where to order a design in BishkekPart of the walls in JBN's first clinic were torn down because of approval requirements: the rooms had looked like mere partitions. The second, 1,000 m² center avoided that fate, since its layout was worked out together with the design from the start
1,200 m² of paneling calculated in 6 days — how much does a precise facade cost in BishkekThe facade joints now run strictly along the floor lines, and the corners come together without a single offcut, even though there'd been fear it would turn out otherwise. The whole 1,200 m² layout was calculated before ordering material, in 6 days, to avoid disputes on site
Couldn't see the difference in price per m² — how construction costs are formed in BishkekA man planning a seven-story hotel got lost in the price per square meter, unable to see the difference between a bare shell and a finished building. Now he knows exactly what the contractor does while he focuses on growing his business